We are pleased to present our projects executed starting from year 2010 up to now:



Design, prefabrication and delivery a chimney - KGHM Polska Miedź S.A. _ Głogów - June 2015
  • H=100m
  • outer stack: DN=4100 mm
  • inner flue gas pipe: DN=3800 (type of steel: CORTEN)



Design, prefabrication and delivery a chimney - KGHM Polska Miedź S.A. _ Głogów - May 2015
  • H=60m
  • outer stack: DN=2250 mm
  • inner flue gas pipe: DN=2000 (steel 316L)


Design, prefabrication, delivery and assembly a chimney - ZTPO Krakow 2014 - step II

  • H=70m
  • outer stack: DN=4000 mm
  • inner flue gas pipes: 2 x DN=1600 (steel 316L)


Prefabrication and delivery a chimney - France 2014
  • H=25m (as one segment)
  • outer stack: DN=2200 mm
  • inner flue gas pipes: 1 x DN=1200 + 1 x DN=320 (Corten B; 6 mm)

 



Design, prefabrication, delivery and assembly a chimney - ZTPO Krakow 2014 - step I

  • H=70m
  • outer stack: DN=4000 mm
  • inner flue gas pipes: 2 x DN=1600 (steel 316L)

 

 Prefabrication and delivery an antenna mast - France 2014

  • H=35,5 m
  • DN=1220 mm

 
Prefabrication a silo - 2014

  • V=65 m3




Prefabrication a tank - 2014

  • V=50 m3




Prefabrication a chimney and elements of installation - Dubaj 2013

 

Hall - Radzionków (PL) 2013 - prefabrication and assembly

  • ~= 5800 m2
  • h = 13,5 m
  • weight: ~= 120 ton
  • hot dip galvanized

 

Prefabrication and delivery a chimney, H=22 m - France 2013

  • prefabrication a four-liners chimney on the following parameters:
    • outer stack diameter = 1900 mm (stal S255JR)
    • inner liners diameters: 3x475mm + 1x635mm (steel 1.4404)
    • H=22 m

 


Prefabrication and assembly a chimney H=30m - Myslenice 2013

  • disassembly of the existing chimney H=30 m
  • prefabrication, delivery and assembly a new chimney on the following parameters:
    • diameter = 800 mm (steel S235JR)
    • H=30 m
    • weight of stack ~ 8 ton

 

 

Prefabrication and assembly a chimney h=70 - Nowy Sacz 2013

  • disassembly of the existing chimney H = 80 m
  • prefabrication, delivery and assembly a new double chimney on the following parameters:
  • outer diameter = 2000 mm (steel S355JR)
  • inner diameter = 1800 mm  (steel 1.4404)
  • h=70 m
  • weight of outer stack ~ 39 tons
  • weight of inner stack ~ 14 tons


 

Prefabrication and delivery a lower chamber dryer - Oswiecim 2013

  • prefabrication and delivery a lower chamber dryer; steel: S235 and 1.4541 (polished)



Silo for cement - 08.2013

  • diameter = 3000mm
  • capacity = 50m3
  • hight = 11,3 m


Prefabrication and delivery a chimney h=30m - Oswiecim 2013
  • prefabrication and delivery a chimney on the fallowing parameters:
    • diameter = 2600 mm
    • H=30 m
    • plate thickness = 10 mm (Corten B)
    • total weight ~ 22 tons
 

 

Prefabrication and assembly of the chimney H = 120 m - Bukowno 2012

  • disassembly of the existing chimney H = 120 m
  • prefabrication, delivery and assembly of new chimney with the following parameters:
    • diameter 1820 mm 
    • H = 120 m
    • plate thickness 10 mm
    • weight ~ 65 t

 


Railway bridge - Jasło 2012

  • brige span 22 m
  • weight ~ = 70 t


The sorting hall - Paczyna 2012 – prefabrication and assembly

  • area ~ = 7000 m2
  • h = 7.27 m
  • weight ~ = 180t
  • galvanized structure

 


Pipeline to Slag Hall - Piekary Śląskie 2012 – prefabrication and assembly

  • the pipelinediameter - 900 mm
  • supporting structure

 


Slag hall - "Orzeł Biały" smelting plant, Piekary Śląskie 2012 – prefabrication and assembly

  • structure ~ 60 tons
  • area = 700 m2
  • h = 12.55 m
  • roof and walls covered by the trapezoidal sheet
  • equipped with: gates, doors, skylights, vents ...

 


Cable pipe rack and compressed air pipe rack in the "Orzeł Biały" - Piekary Śląskie 2012 - prefabrication, assembly and the foundations works

  • ~ 14 tons of structures

 


August BARG on the Wisła river – roofing works Kraków 2012

  • prefabrication of the rolled rectangular shape profiles 

BIG BAG storage hall - Łubie 2011 – prefabrication and assembly

  • area = 630 m2
  • height = 8.75 m
  • weight = 26.5 tonnes

--- Photos coming soon ---

Cold hall for vegetables and fruit processing plant - Kamieniec 2011 – prefabrication and assembly

  • area = 6270 m2,
  • height = 13.8 m,
  • three-nave construction of total weight ~ 280 t
  • oversized lattice trusses - required oversize load transport 


Steel pipe - ABM Solid 2011

  • diameter - 3000 mm
  • length -13045 mm

 


Three pass steel chimney stack with support structure - Mikołów 2011 – prefabrication and assembly
  • h = 60 m,
  • diameter = 2 x 800 mm + 1 x 900 mm,
  • support structure - full rod type: diameter from 80 mm to 150 mm)
  • mineral wool insulation + galvanized steel plate cover

 Klimzowiec sewage treatment installation - Chorzów 2011 - prefabrication, assembly

  • 15 tons of stainless steel construction:
  • ducts diameter 1600/2000 mm,
  • pipes diameter = 1800 mm,
  • access doors (own project),
  • deflectors diameter = 5200 mm and height = 3500 mm

 

Steel chimney stack- Kolbuszowa 2010 – prefabrication and assembly

  • h = 45m
  • diameter = 1036 mm

 

Steel chimney with stainless steel liner - Debica 2010 – prefabrication and assembly

  • h = 60 m,
  • diameter = 1800 mm
  • mineral wool insulation